Loft Boarding

Boards screwed straight onto the joists squash whatever is underneath them. You gain storage and quietly lose insulation performance in the rooms below. Raised boarding gives you both.

  • Raised leg system
  • Full insulation depth kept
  • Stable storage deck
  • 9.97/10 Checkatrade
  • 5.0 Google

Our company is a top-rated service provider

Checkatrade 9.97/10
Google 5.0

Verified reviews

What customers say

    What it involves

    This is the job most people get wrong, usually because someone quoted them for the cheap version. A joist is typically 100mm deep. Current insulation depth is around 270-300mm. Put a board straight on the joist and you have just compressed 300mm of wool into 100mm of space.

    The insulation does not recover. You get a floor and a colder bedroom.

    Boarded loft platform with the full depth of insulation visible beneath the deck edge
    The gap that matters — the deck sits clear of the insulation, not on it.

    Why a direct-to-joist board is a false economy

    Compressed insulation loses most of its value, and it loses it exactly where you have put the boards, which is usually the middle of the loft over the main bedrooms.

    It is also invisible. Nothing looks wrong from below, so the first sign is a room that never quite warms up and a bill that has not moved.

    Raising the deck on legs costs a bit more and solves it completely: the boards sit clear, the wool underneath stays at full depth, and the floor is stronger for it.

    How the job runs

    Start to finish

    1. Free surveyWe check the joist depth, the insulation depth, the hatch, the head height and where you actually want to be able to walk and store.
    2. Insulation sorted firstThere is no point boarding over insulation that needs replacing. If it does, we price both so you can see it in one number.
    3. Raised legs set inFixed through the insulation onto the joists, at the spacing the span needs, so the deck is level and solid underfoot.
    4. Boards downFitted across the legs, the hatch and walkway left clear, and the offcuts and packaging taken away with us.

    The price covers

    What is in, and what is not

    Both halves matter. A quote that lists everything and excludes nothing is usually hiding the extras until the invoice.

    Included

    • Raised leg system so the insulation is never compressed
    • Tongue and groove boarding across the raised deck
    • Insulation checked and topped to depth beneath the platform
    • Hatch and walkway kept clear
    • Waste and offcuts removed

    Not included

    • Loft ladders, hatch enlargement or lighting, which we can quote alongside
    • Anything structural — if the joists will not take a floor, we will say so

    Evidence-led work

    Recent jobs, start to finish

    All case studies →

    FAQs

    The things everyone asks

    Can I not just screw boards onto the joists?

    You can, and it is cheaper on the day. It also squashes the insulation underneath down to joist depth and undoes a good part of what that insulation was doing. We will not fit it that way.

    How much of the loft should I board?

    Usually less than people first ask for. Boarding the area you will genuinely use, around the hatch, keeps the cost down and leaves the rest of the loft working as insulation.

    Will it take proper weight?

    A raised deck on legs is stronger than boards on bare joists, because the load spreads across more of the structure. It is storage, not a room, and we will tell you at survey if the joists are not up to it.

    How long does it take?

    Most boarding jobs are one to three days depending on the area and whether the insulation is being done at the same time.

    Free survey, and a price in writing

    No obligation, no doorstep sales. If we are not the right people for the job, we will tell you that instead.

    9.97 on Checkatrade Check our reviewsVerified customer reviews
    Call 0800 870 8086 Free Survey