Evidence-led work
Real jobs, real results across the UK
Spray foam removal, insulation, boarding, damp proofing and roofing repairs, documented start to finish.
BL3Spray foam removalBuyer's mortgage declined mid-sale. Removed, certified, sale back on.
PO12Loft insulationOld insulation out, loft hoovered, new wool laid the same day.
CW9Damp proofingDPC injection, salt neutralising, membrane, repointing and an air brick.
BL5Spray foam removalFull assessment first, then removal with progress checks in the loft.
S36Insulation & boardingLoft insulated and boarded out for storage above the new wool.
M28Damp proofingRepointing externally, then full damp proof course and membrane inside.
CW11Loft insulationTwo layers of old insulation stripped out, loft vacuumed, new wool fitted.
SY10Ceiling repairReturned after an insulation job to patch and replaster a ceiling.